44 Completion Case Histories
Wednesday, 5 October
361 D-F
Technical Session
Leading the path forward to the next generation of completion technologies through tangible results
-
0830-0855 210302Novel Completion To Manage Crossflow In A Newly Completed Openhole Gravelpack Gas Well. A Case Study From The Norwegian Continental Shelf
-
0855-0920 210096Extensive Laboratory Test To Validate Material Selection For CO2 Injector In Depleted Carbonate Field - A Case Study Of Carbon Capture And Storage Development Project In Offshore Malaysia.
-
0920-0945 210334Successful Intervention Through Multilateral Completion Window For Logging And Wellbore Treatment
-
0945-1010 210417Autonomous ICD Introduction In Singue Field Ecuador: Completion Methodology And Production Evaluation
-
1040-1105 210205Successful AICD Application to Reduce Water Production in a Heavy Oil Greenfield
-
1105-1130 210289Best-in-class Water Control Through The Application Of Autonomous Inflow Control Valves In Villano Field, Ecuador: A Case Study.
-
1130-1155 210163Autonomous Inflow Control Valves Restore Oil Production By Controlling Gas And Water Breakthrough In Acordionero Field, Colombia: A Case Study.