Skip to main content
Loading

54 Novel Completion Design and Tools for New Challenges

Wednesday, 5 October
361 D-F
Technical Session
The future of completions by applying new and existing technologies for the energy and ESG transition
Session Chairperson(s)
Albert McSpadden - Altus Well Experts, Inc.
Andrew Bond - Santos Ltd.
William Norman - Magnolia Completion Specialist Consulting
  • 1400-1425 210471
    A Revolutionary Advanced Displacement System For The Challenges In The 21st Century
    L.J. Detiveaux, TETRA Technologies, Inc.; J. Sanford, QuarterNorth Energy
  • 1425-1450 209991
    Utilizing Low-density Mud Systems To Improve Operational Efficiency For Post Frac Cleanout Of Unconventional Wells In Depleted Areas
    D.C. Peurifoy III, Occidental Oil and Gas; M.C. McGraw, S. Martinez, A. Morales, M. Farish, R. Perkins, A. Merrill, Horizon Mud Company
  • 1450-1515 210130
    Pioneering Oil-Degradable Nano-Composites for Deepwater Sand-Control Tools: To Preclude Annular-to-Tubular Communication During Deployment in Brine, and Degradation-to-Removal in Oil, Ensuing Production
    T. Roy, Damorphe Inc; K. Bennaceur, Damorphe Inc, SPE; M. Singh, Hexpol; D. Markel, L. Harp, H. Ardic, C. Wilkinson, I. Roy, Damorphe Inc
  • 1515-1540 210307
    Closed-loop Geothermal Well Design With Optimization Of Intermittent Circulation And Thermal Soak Times
    A.R. McSpadden, O.D. Coker, Altus Well Experts, Inc.; S.R. Bohlander, Icarus Technologies, Inc.
  • 1540-1605 210399
    Multilateral Technology Enables Record Reservoir Contact In North Sea Subsea Well
    M. Kelsey, Halliburton; T. Fanchin, Halliburton Completion Products and Services; S. Van Der Veen, Halliburton A/S; E. Dahl, Halliburton; K. Skjold, Equinor
  • 1605-1630 210286
    Novel Dual Completion Architecture: Improves Oil Production And Boost Secondary Recovery With Minimal Surface Footprint.
    F. Leon, Schlumberger - Artificial Lift; A.V. Silva, Schlumberger Well Completion & Productivity Group; J.L. Villalobos, Schlumberger Artificial Lift; X. Guerrero, Schlumberger - Well Completions; D. Amores, Schlumberger - Artificial Lift; A.M. Villarreal, Schlumberger S.A.; D.F. Cueva Cevallos, D. Cuenca Riofrio, D.R. Jaramillo Haro, ENAP Sipetrol SA; B.R. Corella, Schlumberger Surenco S.A.; M.A. Perez, Schlumberger - Reda
  • Alternate 210396
    Fracture Plug Completions: Evolution, Technological Advancements, And Reservoir Simulation Guided Implications
    P. Shukla, R. Malpani, M. Dardis, W.M. Norrid, Schlumberger
  • Alternate 210010
    High-resolution Acoustic Imaging For Submillimetric Casing Thickness Quantification And Advanced Effective-area-based Burst Pressure Analyses
    G. Simpson, T. Littleford, A. Battistel, Darkvision Technologies Inc
  • Alternate 210086
    Importance Of Multi-domain Integration In Selection Of A Proper Landing Point For Unconventional Horizontal Drilling And Completions
    S. Narasimhan, Premier Oilfield Group; K. Nguyen, N. Verma, M.F. Fahmy, R. Al-Morakhi, M. Jumah, R.B. Quttainah, Kuwait Oil Company; J. Iqbal, D. Hayes, H. Rowe, S. Arrington, Premier Oilfield Group