24 Old Challenges, New Solutions - Keeping Sand Away!
Tuesday, 4 October
361 D-F
Technical Session
Operator case studies of sand control operations alongside new screen materials and the best practices to answer the sanding risk.
-
0830-0855 210121A Critical Review Of Shunt Tube Deployed Open Hole Gravel Pack Completions Pumped With No Positive Surface Pressure
-
0855-0920 210255Applying Survival Analysis To Sand Failure Control Risk
-
0920-0945 210183Risk Mitigation Measures Implemented By Use Of Expandable Liner To Prevent Alpha-beta Gravel Pack Failure When Unstable Shale Formation Is Exposed
-
0945-1010 210078Understanding And Preventing Incomplete Shunted Open Hole Packs In Trinidad's Colibri Field
-
1040-1105 210128Erosion Resistant Sand Screen: Development And Deployment
-
1105-1130 210377Pioneering Application Of Plasma Spray Coatings To Improve The Erosion Resistance Of Rod Based Wedge Wire Screen
-
1130-1155 209951Design And Qualification Of A New Erosion Resistant Sand Control Screen
-
Alternate 210013A Systematic Approach To Evaluate The Sanding Potential Caused By Formation Shear Failure In Unconsolidated Oil And Gas Reservoirs
-
Alternate 210411A Passive Flow Control Nozzle For Water Choking Application
-
Alternate 210067Holistic Open Hole Stand Alone Screen (OHSAS) Design Approach in Long Horizontal Oil Wells With Multiple Sub-units In Depleted Reservoir At Offshore Malaysia.