Sand Control and Daring Completions: the Challenge Continues!
Wednesday, 22 October
Room 320C
Technical Session
The quest to exploit increasingly complex prospects and enhance the recovery factor of mature fields has posed significant challenges to well completion
Session Chairpersons
-
0830-0855 228213Experimental Assessment and Computational Analysis of Erosion in Sand Control Screens for Oil and Gas Wells
-
0855-0920 227861Proactive Water Shut Off In Open Hole Gravel Pack Completions Using Thermally Deformable Annular Packers
-
0920-0945 227932Overcoming Field Development Challenges in the Ubaque Formation: Insights from an 8-well Horizontal Drilling Program in Colombia's Carrizales Norte Heavy-Oil Reservoir. A Case Study.
-
1015-1040 227908Successful Open-hole Gravel Pack With Alternate Path Technology In Depleted Reservoirs: A Mindset Change In Gulf Of Mexico
-
1040-1105 228018Real Life Results From The Development Testing Of A Novel, Non-metallic High Temperature Remedial Conformable Sand Control Systems For Use In High Rate Gas Wells
-
1105-1130 227869An Innovative Study On Completion Strategies For High-pressure Horizontal Injection Wells In In-situ Combustion: Advancing Efficiency And Recovery In A Western Indian Field
-
Alternate 228024Role of Integrity in Meeting Production Mandates. Prevention of Well Barrier Failures